⚡ Step 2 of 3 — Installation Details
How old is your switchboard / fuse box?
✅
Modern
Less than 15 yrs, RCDs fitted, spare breaker slots
⚠️
Older (15–30 yrs)
May need breaker added or partial upgrade
🔴
Old / Fuse board
Pre-2000 or unsure — likely needs upgrade
Distance from switchboard to where the charger will go?
📏
Short (<5m)
Garage right next to the metre box
📐
Medium (5–15m)
Across the house or a longer wall run
🔗
Long (15m+)
Carport at end of driveway, under-house runs
Where will the charger be mounted?
🏠
Garage / Indoor
Sheltered, no weatherproofing needed
🌧️
Carport / Outdoor
Needs IP-rated mount and outdoor conduit
Your state (affects compliance certificate cost)?
🔌 Step 3 of 3 — Charger & Hardware
What charger type do you need?
⚡
Single-phase 7.2kW
Most common — fills most EVs overnight
⚡⚡
Three-phase 22kW
Faster — needs 3-phase supply at property
🤔
Not sure yet
We'll estimate based on single-phase
Who supplies the charger hardware?
📦
I supply my own
Already purchased (e.g. Zappi, Tesla Wall Connector)
🔌
Installer supplies (standard)
Quality 7kW wall charger, AU standards certified
📱
Installer supplies (smart)
App-controlled, solar & time-of-use optimised
Estimated Installation Cost — Australia 2026
Inc. GST • Labour, materials & compliance certificate • Indicative range based on typical job variables
📋 Cost Breakdown
Total estimated range
✅ Always included in a quality installation
- ✓ Dedicated 32A circuit
- ✓ RCD protection
- ✓ Compliance certificate
- ✓ EVSE commissioning
- ✓ App setup & handover
- ✓ AS/NZS 3000:2018 compliance